model |
traffic Q (m3/h) |
head H (m) |
rotation speed n (r/min) |
efficiency η (%) |
Power N (KW) |
Required cavitation allowance (NPSH)r (m) |
|
shaft power |
Equipped with power |
|
100-200 -250 -315 |
two hundred and thirty-five two hundred and fifty-five two hundred and forty-two |
fifty-two eighty-four one hundred and thirty-four |
two thousand and nine hundred |
eighty-five eighty-three seventy-six |
thirty-nine seventy one hundred and sixteen |
forty-five ninety one hundred and thirty-two |
five five point two four point two |
|
32-125 -160 -200 -250
|
seven point five eight point three seven point five nine point eight |
five point two eight point four thirteen point four twenty-one |
one thousand four hundred and fifty |
forty-one fifty forty-three thirty-eight |
zero point two six zero point three eight zero point six four one point five |
zero point five five zero point five five one point one two point two |
zero point six zero point eight zero point eight zero point nine |
|
40-160 -200 -250 -315 |
twelve point five fourteen point five fourteen point six fifteen |
eight point four twelve point seven twenty-one point five thirty-three |
one thousand four hundred and fifty |
fifty-eight fifty-six point five forty-five thirty-seven |
zero point four nine zero point eight nine one point nine three point six |
zero point seven five one point one two point two five point five |
zero point eight one one zero point seven |
|
50-160 -200 -250 -315 |
thirty-four point five thirty-eight thirty-one thirty |
eight point two twelve twenty-two thirty-two point seven |
one thousand four hundred and fifty |
seventy-one point five seventy-two sixty-three point five fifty-one |
one point one one point seven two point nine five point two |
one point five two point two four seven point five |
one one one zero point seven |
|
65-160 -200 -250 -315 |
forty-seven fifty-two forty-eight forty-seven |
eight point five thirteen twenty-one point five thirty-two point five |
one thousand four hundred and fifty |
seventy-four seventy-four sixty-four sixty-one point five |
one point five two point five four point four six point eight |
two point two three five point five eleven |
zero point five one point two one point two zero point seven |
|
80-160 -200 -250 -315 -400 |
eighty-four eighty-seven eighty-four seventy-seven ninety-one |
seven point nine thirteen twenty point five thirty-two point five fifty-three |
one thousand four hundred and fifty |
seventy-seven seventy-nine seventy-six sixty-seven sixty-five |
two point three three point nine six point two ten twenty |
three five point five seven point five fifteen thirty |
one point five one point six one point four one point one two point four |
|
100-200 -250 -315 -400 |
one hundred and fifteen one hundred and thirty-nine one hundred and thirty one hundred and twenty-five |
twelve twenty point five thirty-two point five fifty-two |
one thousand four hundred and fifty |
eighty eighty-one seventy-five seventy |
four point seven nine point six fifteen twenty-five |
five point five eleven eighteen point five thirty |
one point eight one point seven one point five one point two |
|
125-250 -315 -400 |
two hundred and fifteen one hundred and ninety two hundred and fifteen |
twenty thirty-three point five fifty-one |
one thousand four hundred and fifty |
eighty-four eighty-two seventy-six point five |
thirteen point nine twenty-one thirty-nine |
eighteen point five thirty forty-five |
two point two one point seven one point seven |
|
150-250 -315 -400 -500 |
three hundred and sixty three hundred and seventy three hundred and sixty three hundred and sixty |
seventeen thirty-one point eight fifty point five eighty-two |
one thousand four hundred and fifty |
eighty-two eighty-three seventy-seven seventy-six |
twenty thirty-nine sixty-four one hundred and six |
thirty forty-five seventy-five one hundred and thirty-two |
two point seven two point seven two point nine two point seven |
|
200-250 -315 -400 -500 |
five hundred and eighty six hundred and ten six hundred and ten five hundred and seventy-five |
fourteen point six twenty-eight point five fifty-two eighty-two |
one thousand four hundred and fifty |
eighty-five eighty-seven eighty-four eighty-three |
twenty-seven fifty-four one hundred and three one hundred and fifty-five |
thirty-seven seventy-five one hundred and thirty-two two hundred |
four point eight three point two three point nine three point five |
|
250-315 -400 -500 |
nine hundred and forty nine hundred and forty one thousand and seventy-five |
twenty-three point five forty-six seventy-four |
one thousand four hundred and fifty |
eighty-four eighty-seven eighty-five |
seventy-two one hundred and thirty-five two hundred and fifty-five |
ninety four hundred and sixty three hundred and fifteen |
four point six four point five four point seven |
|
300-400 -500 |
one thousand four hundred and twenty one thousand five hundred and eighty |
forty-one seventy |
one thousand four hundred and fifty |
eighty-five eighty-six |
one hundred and eighty-seven three hundred and fifty |
two hundred and twenty four hundred and fifty |
six |