HomeYour location:HomePump valve fittingsfaninduced draft fan → Y6-30,G6-30 type boiler matched with induced draft fan
Column tabs 
Product name: Y6-30,G6-30 type boiler matched with induced draft fan
specification: Y6-30,G6-30 type boiler matched with induced draft fan
  Zoom Zoom in on the image
Category: Pump valve fittings -- induced draft fan
Column tabs 
Price: factory price
Brand: Shanghai
Place of Origin: China
Column tabs 
Available Quantity: batch
delivery cycle: Spot goods (or inquire by telephone)
tabs
  Shanghai Beiyuan Industry and Trade Co.,Ltd
+86-21-66770508
+86-13916950330

Email 91way@163.com
Wechat 13916950330(Wechat)


Y6-30,G6-30 type boiler matched with induced draft fanDetailed product description:Column tabs

Y6-30, G6-30 boilers are equipped with induced draft fans

At present, there are many boiler series with significant differences in combustion quality. After installing dust removal equipment and waste heat utilization equipment, insufficient suction force is generated, which affects normal operation. In order to overcome the phenomenon of insufficient suction force caused by the above reasons and positive pressure in the furnace, which affects boiler combustion and normal operation, this type of fan is designed and manufactured for users to choose and apply.
G6-30 is the boiler ventilation fan, and Y6-30 is the boiler induced draft fan.

Main parameters of Y6-30 type

machine number

Transmission method

Speed (r/min)

Flow rate (m³

Total pressure (Pa)

Motor Power

model

Power (kW)

three point five

C

two thousand three hundred and fifty

655-1192

726-853

Y801-2

zero point seven five

four point three

C

two thousand and six hundred

1169-2125

1020-1206

Y90S-2

one point five

four point eight

C

two thousand two hundred and fifty

1619-2944

1265-1491

Y90L-2

two point two

five point four

C

two thousand and three hundred

2702-3963

1833-2158

Y100L-2

thirty-four

six point five

C

two thousand one hundred and fifty

2926-4945

2020-2383

Y112M-2

four


Main parameters of G6-30 type

machine number

Transmission method

Speed (r/min)

Flow rate (m³

Total pressure (Pa)

Motor Power

model

Power (kW)

two point eight

A

two thousand and nine hundred

563-1024

1235-1040

Y801-2

zero point seven five

three point five

A

two thousand and nine hundred

1217-1641

1550-971

Y802-2

one point one

four point three

A

one thousand four hundred and fifty

747-1509

814-598

Y801-4

zero point five five

five point four

A

one thousand four hundred and fifty

1602-2505

1295-863

Y90S-4

one point one


Y6-30,G6-30 type boiler matched with induced draft fan
Product Category
All product information on this website is translated by Baidu machine translation, which may not be completely accurate and is only for reference